Extension Scope
The new work must connect structurally, practically, and visually to the existing home.
CASA coordinates the opening, temporary protection, structural support, new envelope, services, and finish transitions around the home that remains.
What you needWhat CASA controls
01Existing Home Review
What you needThe retained structure, services, levels, roof, and access understood before the connection is opened.
What CASA controlsCASA works from the available documentation and site condition to plan protection, staging, and the construction sequence.
02Structural Connection
What you needNew slabs, walls, beams, openings, and upper-floor work tied into the standing building as documented.
What CASA controlsCASA sequences temporary support, demolition, structural work, and enclosure so the connection remains controlled.
03Weather and Services
What you needRoofing, drainage, waterproofing, plumbing, electrical work, and other services connected across old and new areas.
What CASA controlsCASA coordinates weatherproofing and service routes before the connection is concealed by linings and finishes.
04Levels and Finishes
What you needFloors, walls, ceilings, openings, and materials meeting cleanly across the extension line.
What CASA controlsCASA establishes the key levels and material transitions early and carries them through the finishing sequence.